Project Showcase

Weston Aquatic Center

Weston Aquatic Center

Weston, WI

CWE designed the bathhouse, which includes a lobby/entry, men's and women's dressing rooms, toilet and shower facilities, lifeguard room, office, and a unisex family changing room.

Prentice High School

Prentice, WI

 

A 40,000 sq. ft. addition was designed to compliment and expand the existing school facility. The addition included a gymnasium with stage, classrooms, an IMC/library, a computer lab and shop area. The main entrance was designed to allow plenty of natural light into the corridor.

Prentics High School
Greenheck
Greenheck Fieldhouse
Weston, WI
 

This multi-purpose sports facility features an Olympic-sized ice arena, a multi-use gymnasium for basketball, volleyball, tennis and soccer, two racquetball courts, a weight room and aerobic area, full-service concession area, a proshop, seven classrooms and eight locker rooms.

 

Swan Park, Waupaca, WI

This park facility serves the new athletic field complex with men's and women's restroom facilities, a concession room with storage, and a covered canopy area for seating.

Swan Park

Conservatory of Music

Conservatory of Music

Wausau, WI

 

This 13,000 sq. ft. two-story addition houses a recital hall with seating for 160 people and is linked to a newly remodeled reception hall. The facility also includes a choir room/classroom and 22 studios for musical instruction.

 

Three Lakes Fire Station

Three Lakes, WI

 

Upon completing a study of the existing facility, CWE recommended and designed this new fire station, which includes vehicle storage with drive-thru capability, chief's office, communications, kitchen, restroom and support facilities.

Three Lakes Firestation

Boys and Girls Club, Wausau, WI

 

The new home of the Wausau Boys and Girls Club, presently under construction, will serve the club's needs with a full-sized gymnasium, classrooms, offices and a variety of recreational and developmental program areas.

 

Wausau Daily Herald, Wausau, WI


The 21,600 sq. ft. addition and renovation of existing facilities allowed the Wausau Daily Herald to meet the growing office and production needs of this local daily newspaper operation. Moving the transportation garage and customer entrance improved the safety, traffic flow and visual appeal of the facility.

 

 

Aspirus Wittenberg Clinic

Wittenberg, WI

 

The Aspirus Wittenberg Clinic is a 2400 square foot building including x-ray imaging, a procedure room, labs, nurses station, 3 exam rooms, doctor's office, reception, and waiting room.  The structure is wood frame with masonry veneer.  The building was designed using LEED criteria without applying for LEED certification.  CWE has 3 LEED Accredited Professionals on staff.


CWE, INC.
Tel: 715.359.9400 Toll-free: 800.261.5707 Email: general@cwengineers.com